BrannenHartmann270: Unterschied zwischen den Versionen

Aus DCPedia
Wechseln zu: Navigation, Suche
K (Die Seite wurde neu angelegt: „One of important item need to be done before constructing the building structural is that the structural foundation. the type of building foundation are raft foun…“)
 
(kein Unterschied)

Aktuelle Version vom 12. Juni 2012, 07:12 Uhr

One of important item need to be done before constructing the building structural is that the structural foundation. the type of building foundation are raft foundation, footing foundation, piling foundation. Normally before construct a building, we need to check soil condition for that building. It are often done by applied soil investigation(SI). The analysis of SI report will be used for confirm variety of foundation. บริษัทเจาะดิน As a consulting engineer, it will be typically that engineer got to prepare RC drawings for client. client would like it for quantities purpose. Normally, SI can do at the later stage i.e. when the earthworks completion.